  • Harmon Shop Replacement Phase II

    Croton-on-Hudson, NY

    Design/Build project of 3 new buildings and an addition to an existing building all constructed in an operating rail yard, adjacent to active tracks.

    Read More
  • Sunnyside Yard Platform Repair (Tracks 1-36)

    Queens, NY

    Concrete platforms are located between each track to allow railroad personnel safe and efficient travel within Sunnyside Yard. As concrete has deteriorated over time, the platforms have become unsafe, requiring repairs.

    Read More
  • Hammels Wye - Long Term Flood Protection

    Queens, NY

    Design and installation of a perimeter flood wall and flood gates and the construction of a new compressor building, creating long-term protection for the support facilities housed on the campus, which are critical to rail operations in the area.

    Read More
  • Flood Mitigation - Resiliency at 17 Fan Plants & Adjacent Tunnels

    Manhattan, Brooklyn, Bronx and Queens, NY

    Installation of flood mitigation measures at 17 Fan Plants throughout the boroughs of New York including the Bronx, Manhattan, Brooklyn and Queens.

    Read More
  • MTA Capital Construction Harold Trackwork Part 3

    Long Island City, NY

    A difficult and significant portion of work for the East Side Access (ESA) project at Harold Interlocking, the busiest rail junction in the US, is completed by Railroad Construction Company, Inc. on time and on budget. More than 1.85 miles of new track, 13 turnouts and related infrastructure was installed to two crucial sections of mainline track while Long Island Rail Road (LIRR) carried 300,000 passengers each weekday. ESA is MTA's largest capital project, with work across three boroughs and expanding deep below Park Avenue in Manhattan. Additionally, it is the first expansion of LIRR in more than 100 years.

    Read More
  • Buckram Road Bridge Replacement

    Locust Valley, NY

    Replacement of 128-year-old bridge during a single-weekend track outage.

    Read More
  • Hicksville Station & North Track Siding Improvements

    Hicksville, NY

    Complete modernization of the third busiest Long Island Rail Road station, Hicksville. Aesthetic improvements have made the new station one of the most attractive in New York.

    Read More
  • KOENIG SPHERE

    NEW YORK, NY

    Iconic Sphere welcomed home at the new World Trade Center.

    Read More
  • WESTMONT VIADUCT TRACK FASTENING SYSTEM REHABILITATION

    HADDON TOWNSHIP, NJ

    Removal and replacement of the existing track fastening system along the Westmont Viaduct for the Delaware River Port Authority (DRPA) Port Authority Transit Corporation (PATCO).

    Read More
  • Commonwealth Avenue Superstructure Replacement over 1-90

    Boston, MA

    During the highly publicized first summer shutdown for the Commonwealth Avenue Bridge Superstructure Replacement project, RCC completed the replacement of MBTA railroad tracks within a 17-day shutdown.

    Read More