[Company Logo Image]Home Directions Corporate InfoToll Plazas

 

Railroad Construction
bulletToll Booths
bulletElectric & Communication System
bulletConcrete / Pavements                 
bulletInstallations and Rehabilitation

                                                            

Reconstruction of three new toll booths, canopies and installation of electric and HVAC system. Also poured concrete pavement.

NJ Turnpike Exit 5

 
Three additional toll lanes and toll booths constructed  and concrete pavement..

Outerbridge Crossing Toll

Project consisted of one toll canopy added, extended toll booth and concrete pavement.

NJ Turnpike Exit 16W

The project consisted of removal and replacement of existing tollbooths and the installation of 13 new state of the art tollbooths.  A temporary adjunct toll plaza consisting of three tollbooths and canopy was installed to compensate for toll lanes taken out of service.  The plaza canopy was sheathed in stainless steel and equipped with electronics for the EZPass system.

Lincoln Tunnel Toll Plaza

 
Phone:(973) 684-0362   Fax:(973) 684-1355   Email: info@railroadconstruction.com    Modified: 09/10/04